

It's not a 4-speed waterfall. Bill had a pipe rack built against the back wall of his shop and there were still quite a few things on it when the bulldozer pushed the dirt up. I cleared most of it out when we built the waterfall but couldn't lift the transmission. Still can't so it gets buried. Next I have to get the pipe rack cut out, then fill in the hole, then reconcrete the waterfall and spillway, and I'm done. I actually got a lot accomplished today and barely hurt myself. I only smashed my finger with the wrecking bar (think about all of the stuff I could have smashed). But then I sliced the same finger on a piece of tin and the swelling instantly went down so it feels a lot better now.